After closing, with keys in hand, Tori and Drew can’t wait for life in their new home. Happy Happy Day!!!!! < PREVIOUS STEP BACK TO BUILDING STEPS >
Step 18: Final Touches
After all is said and done, James and Linn are checking to make sure that everything is just right. Doors are adjusted, hardware is installed, and appliances are checked. The cleaning crew does the final cleaning and everything is just wonderful. < PREVIOUS STEP NEXT STEP >
Step 17: Paint & Finishes
Gabriel is finishing up the painting. He paints the trim before the roof, then the walls and trim after sheetrock, then applies the paint touch up after flooring is installed. Tori can’t wait to move in. < PREVIOUS STEP NEXT STEP >
Step 16: Lights Are On
Mark Coleman of Emerson Electric makes sure that the lights are set and hung perfectly. Marc and his group run wire in the framing stage, again after trim, and finally when fixtures are hung. The house is so beautiful. < PREVIOUS STEP NEXT STEP >
Step 15: Tile, Granite & Flooring
Susan with Porter’s Flooring America oversees all tile, wood, and carpet installation. Porter’s Flooring is considered our area’s leading tile and flooring installer. Whatever beautiful showers, floors, backsplashes, inserts, whatever we can think of, Susan makes it happen! Dustin Hansen comes back and installs plumbing hardware. The house is coming together. < PREVIOUS STEP NEXT […]
Step 14: Trim is Going Up
Sheetrock is installed, taped and floated. Wallcot Trim is on the job. Trim is Carl’s business and he is the best. Whatever you can dream up Carl makes happen. Its looking like a house now. < PREVIOUS STEP NEXT STEP >
Step 13: Bricking the Exterior
Geraldo Ibarra is a master craftsman, and has been bricking homes for Abshire Building Group from day one. Whatever you wish, he will create. Stucco, Stone, Brick or a combination, inside or outside Geraldo always delivers professional work. < PREVIOUS STEP NEXT STEP >
Step 12: Tim On Roof
After framing exterior walls, the house is wrapped with 7 /16″ O.S.B. , Roof Decking is 7/16 O.S.B. with Techshield. This will be the basis for building a green house. Tim Abshire of Abshire Roofing will apply Weatherwood architectural composition roof. < PREVIOUS STEP NEXT STEP >
Step 11: James Checks Framing
Benjamine Olvera frames the house. Benjamine has worked closely with Abshire Building Group for many years now, and does dependably professional work. James walks the house every day to make sure that the framing is going according to plan. < PREVIOUS STEP NEXT STEP >
Step 10: The Foundation
The plumbing is installed, the electrical is in, the beams are formed and it’s time for concrete. The pumper arrives early and the concrete foundation is poured. We are now 90 days from completion with good weather. < PREVIOUS STEP NEXT STEP >